Trench Backfilling Quotes

Get Professional Services

Our Trusted Partners
INF Construction

Cost of Trench Backfilling in Port Angeles

Trench backfilling is a crucial step in various construction and landscaping projects in Port Angeles, WA. This process involves filling a trench with soil, gravel, or other materials to restore the ground to its original state or to provide a stable base for further construction. Understanding the cost of trench backfilling in this region can help homeowners and contractors budget effectively for their projects.

Factors Influencing Costs

  • Soil Type: Different soil types require different handling and may affect the overall cost.
  • Trench Depth and Width: Larger and deeper trenches will generally require more material and labor.
  • Material Used: The type of backfill material, such as gravel, sand, or native soil, can influence the price.
  • Labor Rates: Local labor rates in Port Angeles, WA, can vary and impact the total cost.
  • Accessibility: The ease of access to the trench site can affect the cost, with difficult-to-reach areas potentially costing more.
  • Equipment Required: The type of machinery needed for the backfilling process can add to the cost.
  • Permits and Regulations: Local permits and adherence to regulations may incur additional expenses.

Average Costs for Common Tasks

Task Description Average Cost (Port Angeles, WA)
Basic Soil Backfilling $1.50 - $3.00 per cubic yard
Gravel Backfilling $2.50 - $5.00 per cubic yard
Sand Backfilling $2.00 - $4.50 per cubic yard
Labor Costs (per hour) $40 - $60
Equipment Rental (per day) $150 - $300
Permit Fees $50 - $200

Trench Backfilling